Skip to content
WEARCOACH: Home pageWEARCOACH: Home page

Template A5

90-day integration plan

Eight fields that turn what you learned into a plan for your own team. Module 5 ends with this plan.

0 / 8 fields filled

  1. Be specific about what already exists: most plans fail by ignoring the current workload.

    Examples
    Grassroots football
    Grassroots youth football academy; 20 players aged 12-16; budget €1,200; paper sRPE logs + shared GPS pod.
    Para sport
    Wheelchair-basketball team; 12 senior athletes; national league; IMU stroke counts + weekly shoulder-pain scales.
  2. If it cannot be answered yes or no by day 90, it is a theme, not a question.

    Examples
    Grassroots football
    Can weekly sRPE-based load flags reduce avoidable overuse complaints this season?
    Para sport
    Can stroke-count + shoulder-pain monitoring catch overuse two weeks earlier?
  3. Use the mean and SD you computed in Module 3.

    Examples
    Grassroots football
    Weekly sRPE, monotony, ACWR (from sRPE), wellness. Flag: ACWR>1.5 or 2 wks wellness decline.
    Para sport
    Weekly stroke count vs 8-wk chronic, shoulder-pain (0-10), wellness, sRPE. Flag: pain >=4 or +1 SD strokes.
  4. Start from the gaps your self-audit flagged.

    Examples
    Grassroots football
    Guardian consent (minors), coach-only access, retain 24 months post-season (Template A1).
    Para sport
    Explicit athlete consent, medical+coach access, retention per club policy (Template A1).
  5. Brief before the system runs, not after the first flag fires.

    Examples
    Grassroots football
    Brief players + parents at season start; frame flags as 'modify, not punish'.
    Para sport
    Brief athletes; pain scales collected privately; framing as shared decision.
  6. Day 30 is usually about compliance, day 60 about data quality, day 90 about decisions changed.

    Examples
    Grassroots football
    D30: logs complete >90%. D60: flags reviewed weekly. D90: fewer overuse complaints vs baseline.
    Para sport
    D30: monitoring routine embedded. D60: 2 early flags acted on. D90: lower shoulder time-loss.
  7. Book them now. A review that is not in the calendar does not happen.

  8. The field most coaches leave blank, and the one that protects your credibility.

    Examples
    Grassroots football
    Stop if logging burden causes drop-off or players show number anxiety.
    Para sport
    Stop if monitoring adds no decision value or increases athlete anxiety.

What you worked out in the modules

What you work out in the module tools appears here, and goes into the printed plan and the file: your baseline, your early-warning system, your governance audit and your reflections.

Review your plan

Read your plan field by field and rate each one. Be honest: the rating is for you, or for a colleague who reviews your plan in a course.

In placePartlyWatch for
1 Context analysisStates the sport, the level, the number of athletes, what is monitored today, the resources available and who is on the staff.Names the setting, but says nothing about current practice or current workload.Most plans fail by ignoring the current workload.
2 PDCA questionOne specific question that wearables will answer this season, and that can be answered yes or no by day 90.A theme, or several questions at once.If it cannot be answered yes or no by day 90, it is a theme, not a question.
3 Metrics (3-5) + personalised thresholds for one named athleteThree to five metrics, with personalised thresholds for one named athlete.Metrics are listed, but there are more than five, or the thresholds are missing or not personalised.Use the mean and SD you computed in Module 3.
4 Governance statement (consent, access, retention)Says how consent is obtained (from guardians too, for athletes under 16), who has access, how long the data is kept, and who owns each.Covers consent, but leaves access or retention open.Start from the gaps your governance self-audit flagged.
5 Communication plan (athletes / parents)Says how athletes (and parents, where applicable) will be briefed, and when.A briefing is planned, but only after the system has started, or without saying how.Brief before the system runs, not after the first flag fires.
6 Success criteria at Day 30 / 60 / 90Says what will be true at day 30, at day 60 and at day 90 if the plan is working.Describes success in general terms, or for day 90 only.Day 30 is usually about compliance, day 60 about data quality, day 90 about decisions changed.
7 Review checkpoints (calendar dates)Calendar dates for review, booked, with the people who will sit in the room.Intervals without dates.A review that is not in the calendar does not happen.
8 Stop conditionsNames what would cause you to stop or substantially change the plan.A general intention to review if needed.The field most coaches leave blank, and the one that protects your credibility.
  • The plan is usable when at least six of the eight fields are filled in, whether you rate them "Partly" or "In place".
  • In a course, plans are reviewed by a peer in the cohort. On your own, review your plan within two weeks of writing it.
Co-funded by the European Union

WEARCOACH: Leading the Way in Wearable Technologies for Sports Coaching. Project reference: 101229603. https://wearcoach.sports4.eu/toolkit/integration-plan/

Co-funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or the European Education and Culture Executive Agency (EACEA). Neither the European Union nor EACEA can be held responsible for them.